Quick answer
Who supplies pipe fittings & flanges in Pemba, Mozambique?
Hurain Engitech & Trade (Palanpur, Gujarat, India) is a pipe fittings & flanges manufacturer, supplier and exporter serving Pemba. Orders ship FCL or LCL to Pemba in about 18–28 days, quoted FOB, CFR or CIF. Flanges, elbows, reducers and connectors in carbon steel, stainless steel, alloy steel, CPVC and brass.
Why Pemba needs pipe fittings & flanges
Logistics base for the Cabo Delgado LNG projects. Every pipeline needs elbows, tees, reducers and flanges in matching grades and schedules, ordered together with the pipe for each project or repair.
Mozambique is developing large LNG projects in Cabo Delgado, coal mining in Tete and port corridors at Maputo, Beira and Nacala that serve its landlocked neighbours.
Oil, gas & petrochemicals in Pemba
Pemba's hydrocarbon sector needs a steady supply of alloy and carbon steel piping, API-standard valves and spiral-wound gaskets. Plant maintenance teams value a supplier who ships the whole line list with EN 10204 3.1 documentation in one container.
In Pemba, upstream oil & gas and refineries buy pipe fittings & flanges from us mainly for process piping and oil and gas pipelines.
Who buys pipe fittings & flanges: Upstream oil & gas · Refineries · Petrochemical plants · Fuel depots
Typical uses: Process piping · Oil and gas pipelines · Water and fire lines · HVAC · Building plumbing.
Delivery of pipe fittings & flanges to Pemba
- 1Export from Mundra or Kandla (Gujarat)Goods are inspected, export-packed and customs-cleared in India, usually within a day's drive of our Palanpur base.
- 2Sea freight to PembaIndicative transit 18–28 days (Southern Africa), FCL or LCL, on FOB, CFR or CIF terms.
- 3Clearance at PembaPemba is itself the port of discharge, so goods clear customs locally and reach your warehouse quickly.
Transit times are indicative; the confirmed schedule is set out in the quotation.
Local support for buyers in Pemba
| Office hours | 24×7 — three 8-hour shifts, every day, so the whole Mozambique working day is covered |
|---|---|
| +91 87809 43729 | |
| Phone | +91 87809 43729 |
| hurainengitechandtrade@gmail.com | |
| Languages | English, Hindi, Gujarati, Urdu (local language: Portuguese) |
| Quotation | USD (MZN equivalent on request), within 1–2 business days |
Importing pipe fittings & flanges into Pemba: local guide
Practical facts for buyers in Pemba, Mozambique — working days, time difference, customs system, trade-agreement duty and the seasons to plan around.
| Weekend | Saturday–Sunday (many trading firms also work Saturday mornings) |
|---|---|
| Our office hours in your time | 24×7 — three 8-hour shifts, every day, so the whole Mozambique working day is covered |
| Country calling code | +258 (our WhatsApp: +91 87809 43729) |
| Business languages | Portuguese; we correspond in English |
| Currency | Mozambican metical (MZN); quotations in USD |
| Customs system | Janela Única Electrónica (single window) |
| Tariff framework | SADC member |
| Trade agreement with India | No India-specific trade agreement; standard (MFN) duty applies |
| Plan orders around | the Christmas–New Year period, when many buyers and forwarders close |
Leading industries in Pemba
- Oil, gas & petrochemicalsBuys pipe fittings & flanges: Upstream oil & gas, Refineries, Petrochemical plants
- Marine, ports & fisheriesAlso buys: Shipyards, Port operators, Fishing fleets
- Hospitality & real estateAlso buys: Hotels & resorts, Restaurants & catering, Serviced apartments
Pipe Fittings & Flanges specifications for Pemba
Typical specification range for pipe fittings & flanges; exact values are confirmed per order and matched to Mozambique's import requirements.
| Flange types | Weld neck, slip-on, blind, socket weld, threaded, lap joint |
|---|---|
| Fitting types | Elbow 45°/90°, tee, reducer, cap, coupling, union |
| Materials | A105, A182 F304/F316, A234 WPB, CPVC, brass |
| Size range | ½" to 48" |
All 4 pipe fittings & flanges we supply in Pemba
Standards: ASME B16.5, ASME B16.9, ASME B16.11, EN 1092-1 or the standard your project specifies. Check pre-shipment inspection and conformity requirements with your clearing agent before shipping.
