Quick answer
Who supplies flanges in Doba, Chad?
Hurain Engitech & Trade (Palanpur, Gujarat, India) is a flanges manufacturer, supplier and exporter serving Doba. Orders ship FCL or LCL to Kribi in about 28–45 days, then 2–3 weeks by road inland, quoted FOB, CFR or CIF. Forged weld-neck, slip-on, blind and socket-weld flanges in carbon, stainless and alloy steel.
Why Doba needs flanges
Oil fields linked by pipeline to Kribi. Every pipeline needs elbows, tees, reducers and flanges in matching grades and schedules, ordered together with the pipe for each project or repair.
Chad is a landlocked oil producer with cotton and livestock, supplied through Douala.
Oil, gas & petrochemicals in Doba
Doba's hydrocarbon sector needs a steady supply of alloy and carbon steel piping, API-standard valves and spiral-wound gaskets. Plant maintenance teams value a supplier who ships the whole line list with EN 10204 3.1 documentation in one container.
In Doba, upstream oil & gas and refineries buy flanges from us mainly for process piping and oil and gas pipelines.
Who buys flanges: Upstream oil & gas · Refineries · Petrochemical plants · Fuel depots
Typical uses: Process piping · Oil and gas pipelines · Water and fire lines · HVAC · Building plumbing.
Delivery of flanges to Doba
- 1Export from Mundra or Kandla (Gujarat)Goods are inspected, export-packed and customs-cleared in India, usually within a day's drive of our Palanpur base.
- 2Sea freight to KribiIndicative transit 28–45 days (Central Africa), FCL or LCL, on FOB, CFR or CIF terms.
- 3Inland to DobaAbout 2–3 weeks by road, arranged by your clearing agent or forwarder after customs clearance.
Transit times are indicative; the confirmed schedule is set out in the quotation.
Local support for buyers in Doba
| Office hours | 05:00–14:30 Chad time (09:30–19:00 IST), Monday to Saturday |
|---|---|
| +91 87809 43729 | |
| Phone | +91 87809 43729 |
| hurainengitechandtrade@gmail.com | |
| Languages | English, Hindi, Gujarati, Urdu (local language: Arabic, French) |
| Quotation | USD (XAF equivalent on request), within 1–2 business days |
Importing flanges into Doba: local guide
Practical facts for buyers in Doba, Chad — working days, time difference, customs system, trade-agreement duty and the seasons to plan around.
| Weekend | Saturday–Sunday (many trading firms also work Saturday mornings) |
|---|---|
| Our office hours in your time | 05:00–14:30 Chad time (09:30–19:00 IST), Monday to Saturday |
| Country calling code | +235 (our WhatsApp: +91 87809 43729) |
| Business languages | Arabic, French; we correspond in English |
| Currency | Central African CFA franc (XAF); quotations in USD |
| Tariff framework | CEMAC common external tariff |
| Trade agreement with India | No India-specific trade agreement; standard (MFN) duty applies |
| Plan orders around | Ramadan and the Eid holidays, plus the Christmas–New Year period |
Leading industries in Doba
- Oil, gas & petrochemicalsBuys flanges: Upstream oil & gas, Refineries, Petrochemical plants
Flanges specifications for Doba
Typical specification range for pipe fittings & flanges; exact values are confirmed per order and matched to Chad's import requirements.
| Flange types | Weld neck, slip-on, blind, socket weld, threaded, lap joint |
|---|---|
| Fitting types | Elbow 45°/90°, tee, reducer, cap, coupling, union |
| Materials | A105, A182 F304/F316, A234 WPB, CPVC, brass |
| Size range | ½" to 48" |
Standards: ASME B16.5, ASME B16.9, ASME B16.11, EN 1092-1 or the standard your project specifies. CEMAC rules apply.
